- Advertisement -spot_img

TAG

Gridwatch

PLN Procurement Criticism Shadows Presidential Launch

Indonesia’s clean energy ambitions face a familiar tension: presidential investment announcements versus utility-level execution gaps.

Indonesia Revives B50 After January Delay As Hormuz Disruption Reshapes Diesel Economics

Indonesia’s B50 program is described by senior Energy Ministry officials as the first mandatory 50% biofuel blend program in the world, drawing study visits from countries seeking to replicate the model.

Rosatom And US Vendors In Parallel Engagement As Malaysia Keeps Nuclear Technology Options Open

No final decision on reactor technology, plant location, or construction contract has been announced; Malaysia’s nuclear programme remains in the structured pre-deployment feasibility phase.

Laos-Japan Comprehensive Strategic Partnership Targets Clean Energy And Mining In June Summit

Japan’s POWERR Asia framework, endorsed by Laos at the June 10 Tokyo summit, targets both short-term fuel security and long-term structural energy resilience across Asia.

Rosatom Secures Laos Nuclear Framework As ASEAN Vendor Competition Intensifies

The June 15 Laos nuclear agreement expands Rosatom’s ASEAN presence at a moment when regional energy security concerns are reshaping how governments evaluate long-term generation options.

How Vendor Competition And ADB Reform Are Reshaping Southeast Asia’s Nuclear Outlook

Rosatom, GE Vernova-Hitachi, KEPCO, and Framatome are all active in Southeast Asia. The region has gone from nuclear-adjacent to a genuine multi-vendor competition in under two years.

Envision Energy Brings AI Operations Platform To Monsoon Wind Expansion In Laos

Asia’s first cross-border wind power PPA ran from Laos to Vietnam. The next phase may include storage, solar, and hydrogen on the same plateau.

HiTHIUM Launches 8-Hour BESS And Secures Vietnam Foothold At SNEC 2026

Long-duration storage is no longer a niche category. HiTHIUM’s 8-hour BESS launch reflects where Southeast Asian grid procurement is heading.

TNB And PetGas Form Joint Venture For Perak Gas Infrastructure

The Lumut terminal brings Malaysia’s total regasification send-out capacity to 1,490 MMscfd once operational alongside existing Melaka and Johor facilities.

Behind The Headline: What Indonesia’s 17.89 Percent Renewable Mix Figure Actually Measures

Total national electricity production in Indonesia reached 165.51 TWh as of April 2026. Renewable energy contributed 17.89 percent of that figure. Coal contributed the rest. The transition is measured in percentage points; the fossil base is measured in terawatt-hours.

Latest news

- Advertisement -spot_img